Welcome to Shandong Xingtian Machinery Co., Ltd.

tell
Search
Check category

Shandong Xingtian Machinery Co., Ltd. Large cylinder automatic intelligent production line project (phase I) completion of environmental protection acceptance announcement

I. Basic Project Information


Project Name: Large Cylinder Automatic Intelligent Production Line Project of Shandong Xingtian Machinery Co., Ltd. (Phase I)
Construction Address: South 600m Road East, the interchange of West First Ring Road and West Xinhua Road, Longjiaquan Street, Yishui County
Construction content: This project is a technical renovation project. The main construction content is to carry out equipment upgrading and technical transformation in the existing painting workshop of 1600m2 and the processing workshop of front cylinder of 2000m2 (intelligent equipment workshop). The products are 300,000 units /a hydraulic cylinder spray paint parts in the painting workshop and 12,000 units of automobile front cylinder in the intelligent equipment workshop.
Acceptance only for the first phase of construction, 300000 / a hydraulic cylinder for the paint shop, mainly equipped with automation line of spray paint, including 1 pre-treatment cleaning equipment, four spray paint room, a spray paint drying room, 1 set of spray drying heating equipment, one activated carbon adsorption device, 1 UV photolysis all-in-one, 1 mist purification tank, etc.


II. Basic information of the construction unit


Construction unit: Shandong Xingtian Machinery Co., Ltd
Company address: East of South 600m Road, the interchange of West First Ring Road and West Xinhua Road, Longjiaquan Street, Yishui County
Contact person: Li Qin
Telephone: 15265172158


III. Basic information of acceptance testing unit


Company name: Shandong Lukong Testing Co., Ltd
Company address: No. 3302, Jingshi East Road, Jinan City, Shandong Province
Contact person: Zong Fan
Telephone: 0531-88984367


IV. Acceptance conclusion


XingTian machinery co., LTD. Shandong large cylinder intelligent automatic production line project (phase I), the main construction contents into a hydraulic oil cylinder spray paint line 300000 units/year, including a pre-treatment cleaning equipment, four spray paint room, a spray paint drying room, 1 set of spray drying heating equipment, and supporting the construction of the waste gas treatment facilities. The waste gas treatment process is "negative pressure collection + water curtain + paint mist purification box +UV photooxygen + activated carbon adsorption". No major changes occurred in the project construction.
The waste water produced during the operation of this project, including the cylinder cleaning waste water and the water curtain paint mist purification waste water, shall be treated by the existing sewage treatment station in the plant and meet the requirements of Grade A in Table 1 of the Water Quality Standard for Sewage Discharged into Urban Sewers (GB/T31962-2015).
The concentration of VOCs emission in the organized exhaust gas meets the emission standard requirements in Table 2 of the Volatile Organic Compounds Emission Standard Part 5: Surface Coating Industry (DB37/2801.5-2018). The concentration of particulate matter meets the concentration limit requirements of "key control areas" in Table 1 of Shandong Province Regional Comprehensive Air Pollutant Emission Standard (DB37/2376-2019). The monitoring concentration of unorganized VOCs at the factory boundary meets the emission standard requirements in Table 3 of the Volatile Organic Compounds Eemission Standard Part 5: Surface Coating Industry (DB37/2801.5-2018); Monitoring concentration of unorganized particulate matter in plant boundary "Comprehensive Air Pollutant Emission Standard" (GB16297-1996) Table 2 Limits for unorganized emission concentration.
The noise monitoring value of the factory boundary meets the requirements of Category 2 functional area standard in the Environmental Noise Emission Standard of the Factory Boundary of Industrial Enterprises (GB12348-2008).
General industrial solid waste such as waste water paint bucket for sale and comprehensive utilization; Waste UV lamp tubes, waste photocatalyst cotton, waste filter cotton, waste activated carbon and other hazardous wastes shall be disposed of by qualified units. The disposal of solid waste should meet the requirements of EIA and approval.
Shandong Xingtian Machinery Co., Ltd. Large cylinder automatic intelligent production line project (phase I), in the construction process, the basic implementation of environmental protection "three simultaneous" system requirements, the establishment of environmental management system, equipped with environmental management personnel. During the actual construction process and equipment commissioning, the environmental protection measures proposed in the environmental impact report form and the approval were implemented, and the pollutants were discharged stably within the standard. Generally in line with the completion of the construction project environmental protection acceptance conditions.


V. Starting and ending time of public announcement


The publicity time is 20 working days, from October 10, 2020 to November 05, 2020 BBB 0. The public can provide valuable opinions on the environmental protection work of the project through E-mail, letter, telephone, etc.

WeChat

Follow WeChat

这是描述信息

Mobile official website

NEWS

Tel : 86-539-2252966

 Fax:86-539-2253673

Mail:ysxingtian@126.com

Address:Longjiaquan Industrial Park,

                Yishui County

Copyright © Shandong Xingtian Machinery Co., Ltd.  All Rights Reserved    鲁ICP备10210306